The temperature of the air and the substrate to be treated until the primer is completely dry should be within the range of +5°C to +30°C, and the relative humidity up to 80%. The temperature of +20 ± 2°C and the relative humidity of 55 ± 5% are the most effective for applying the primer. Under other conditions, the drying time of the primer may change.
For the treatment of hygroscopic surfaces (with intensive water absorption), such as aerated concrete, foam concrete, gas silicate, shell rock, the primer REDBAG POROBAR CONCENTRATE must be mixed before use, and then diluted with water in a ratio of 1:5 and mixed again.
It is recommended to mix the primer every time before carrying out work. Apply the primer diluted with water evenly to the surface using a brush, roller, brush or mechanized method. Do not apply undiluted!
Following operations with the surface treated with the primer should be carried out only after it has dried no earlier than 12 hours. The time interval between the end of the drying of the primer and the start of the next work should be as short as possible to avoid the settling of construction dust on the surface of the base.
After carrying out work, immediately rinse the used tools and containers with water. Do not add other materials to the primer.