The base must be dry, not frozen, strong, capable of bearing loads, free from dust, dirt, oils, greases, old paint residues, wax and other substances that reduce adhesion, have uniform water absorption, and meet the requirements of DSTU-N B A.3.1-23:2013, DSTU-N B V.2.6-212:2016. Remove weak areas of the base, and level surface irregularities over 10 mm using the REDBAG 112 mixture 24 hours before starting work.
The concrete base must not shrink after laying the tiles, therefore, when finishing, it must be no younger than 3 months from the moment of laying the concrete, and the residual humidity of the concrete must be below 4%. Cast concrete bases have a smooth surface and low moisture absorption, so after cleaning before finishing, they must be treated with an adhesive primer for dense, smooth, low- or no-moisture-absorbing bases - REDBAG SUPERSTICK.
Bases made of cement screeds, cement, cement-lime plasters must have a residual moisture content below 4%. Such bases have a high moisture absorption, so after cleaning before finishing, they must be treated with a deep penetration primer REDBAG ADHESIS.
Aerated concrete must be cleaned of dust and treated with a vapor-permeable primer for hygroscopic surfaces REDBAG INTERLACE before finishing.